Lex is closely involved with clients for planning upgrade work with minimum interruption to the existing system and plant processes during the changeover from existing to the new system. Lex is well versed with utility interconnection requirements for load only distribution systems as well as with power generation systems.
Iona Island Waste Water Treatment Plant
Northwest Langley Waste Water Treatment Plant
Capilano Raw Water Pumping Station